Design data structure: fastener type steel pipe scaffold planks laid rules

图片
Design data structure: fastener type steel pipe scaffold planks laid rules (1) the scaffold should be covered, spread, leave the metope of 120 ~ 150 mm. (2) the docking or lap shall conform to the norms. Scaffolding probe diameter of 3.2 mm galvanized steel wire fixed on the supporting rods. (3) in the corner, ramps platform of scaffold board and mouth should be connected to the transverse horizontal pole reliable, prevent slippery. (4) from the top operation layer under the scaffolding of plan, appropriate every 12 m spread a layer of scaffolding.

Design data structure: fastener type steel pipe scaffold construction preparation

图片
Design data structure: fastener type steel pipe scaffold construction preparation 1. The unit engineering head should, according to the requirement of the construction organization design of the scaffold to set up and use of personnel for technical disclosure. 2. Should be in accordance with the provisions of this specification and the requirements of construction organization design for steel pipes, fasteners, scaffolding and other inspection acceptance, unqualified products shall not be used. 3. After the inspection of components should be classified according to the varieties, specifications, neatly stacked, smooth, yard can not have water. 4. The erection site shall be removed sundry, level off the erection site, and make the drainage unblocked. 5. When the scaffolding equipment foundation under foundation, pipe trench, in use should not be in the process of excavation, otherwise the reinforcement measures must be taken.

Design data structure: fastener type steel pipe scaffold lateral horizontal pole set-up

图片
Design data structure: fastener type steel pipe scaffold lateral horizontal pole set-up (1) the erection of lateral horizontal pole should comply with the regulations of the structure of the specification. (2) double row scaffolding lateral horizontal distance on the surface of the rod side against the wall to wall decoration should not be greater than 100 mm. (3) single row scaffolding lateral horizontal pole should be not installed in the following parts: 1) design is not allowed to keep the foot hand-eye. 2) on the lintel and lintel ends into 60 ° Angle of the triangle range and lintel net span half the height of the range. 3) the width of the wall between the Windows of less than 1 m. 4) beam or girder under the pad and its 500 mm on both sides of the range. 5) brick masonry of the doors and Windows on both sides of the hole 450 mm to 200 mm and the corner of the range. Other masonry of the doors and Windows on both sides of the hole 600 mm to 300 mm and the corner of the

Design data structure: fastener type steel pipe scaffold old steel pipe inspection rules

图片
Design data structure: fastener type steel pipe scaffold old steel pipe inspection rules (1) surface corrosion depth should comply with the rules. Rust should check once a year. Check, should be in steel pipe corrosion serious three root extract, in the area of each corrosion serious transverse sampling inspection, shall not be used when the corrosion depth more than a specified value. (2) steel tube bending deformation should comply with the rules.

price list 2016.06.23

图片
Note:The price is only for reference.There will be a little change because of quantity and oeder tir.Any inquiry pls send to our e-mail: scaffolding@hunanworld.com A large quantity of favorably.We will offer the best price and delivery to you.Thanks.

The construction fastener type steel pipe scaffold couplers

图片
The construction fastener type steel pipe scaffold couplers 1. The fastener type steel pipe scaffold should be made of malleable iron fasteners, its material should be consistent with existing national standards "steel pipe scaffold fastener" regulation. Made of other materials fasteners, should the test show that the quality is in conformity with the provisions of the standard rear can use. 2. The scaffold fasteners, the bolt tightening torque of 65 n · m, shall not be destroyed.

The "charging" for the newcomers of Shinestar Group

图片
The "charging" for the newcomers of Shinestar Group Recently, Newcomers of Shinestar Group attended the 2016 new employees training activities. In order to make the new staff are more involved in the working, to get deeper understanding of the Shinestar ’s corporate culture, to adapt to new environment, to enhance the sense of belonging and increase the skill of working for the new staff. Achievement of internal staff ,Achievement of external customers is the company's mission.The group has always attached great importance to the training and shaping of the staff. Every year for the growth of new employees, reserve personnel training and vocational skills upgrading, and also there is a detailed training program. With the development of the enterprise, personnel change constantly new employee orientation, some new people just out of college, some staff just converting industry, for industry, companies are not quite understand, in view of this situation, the HR Department

Construction safety management: the ways to improve the level of scaffolding engineering technology and management

图片
Construction safety management: the ways to improve the level of scaffolding engineering technology and management In particular, reflected in the following seven aspects: (1) as the top of a host and difficult construction, multi-storey building scaffold architecture has already can't adapt to and meet the construction requirements, not only on the experience of the workers to build, must strict design calculation, and make the staff to master the technology and construction requirements, to ensure safety. (2) for the first time to use, there is no precedent of high, difficult, a new scaffold, on the basis of the careful design, still need to make the necessary load test, test its bearing capacity and safety reserve, after to ensure reliable to use. (3) for tall, tall, large-span building and have other special requirements of scaffolding, because in the safety protection requirements increase, therefore, must be taken into consideration seriously. (4) construction scaffoldi

Construction safety management: coupler type steel pipe scaffold structure

图片
Construction safety management: coupler type steel pipe scaffold structure The fastener type steel pipe scaffold is mainly composed of steel pipe and fasteners. Steel pipe generally USES 48 mm outside diameter, wall thickness of 3.5 mm of welded steel pipe, or 51 mm outside diameter, wall thickness, 3-4 mm seamless steel tube. Fasteners including rectangular, rotary and docking fastener. The scaffolding system is composed of steel scaffolding (bamboo scaffolding), small bar, bar, poling and bracing, Rachel parts and fasteners to connect them.

Construction safety management: scaffolding material safety technical disclosure

图片
Construction safety management: scaffolding material safety technical disclosure Scaffolding material requirements: 1. To scalping logs for Chinese fir from and other durable material specifications. Poplar, willow, birch, basswood, pinus tabulaeformis and other decadent, cracked, dry wooden bans the use, such as its small head effective not less than 8 cm in diameter, 2. Poling if using steel pipe for the vertical rod, the outside diameter to adopt 48 ~ 51 mm steel pipe and wall thickness of 3-3.5 m, length in 4 ~ 6.4 m and 2.1 ~ 2.3 advisable, severe corrosion, bending, flattening or cracks may not be used. 3. The main rail material is still the skinned Chinese fir from or tough logs, small head effective diameter not less than 8 cm meal or 48 ~ 51 mm diameter steel pipe, wall thickness 3-3.5 mm. 4. The small bar length is 2 to 3 m, Chinese fir from tough or log when small head has a diameter greater than 9 cm. Steel pipe diameter is 49-51 cm, wall thickness 3-3.5 mm. 5. Scaff

price list 2016.06.16

图片
http://www.hunanworld.com/ Note :The price is only for reference.There will be a little change because of quantity and oeder tir.Any inquiry pls send to our e-mail: scaffolding@hunanworld .com   A large quantity of favorably.We will offer the best price and delivery to you.Thanks

Shinestar Visiting Customers In UAE And Distributing Market In The Middle East

图片
The Middle East is famous for the rich oil resources all over the world, oil pipeline and other oil equipment are a huge demand for the Oil production and transportation, so the Middle East is the main market of many oil equipment export companies. In order to cooperate with the global strategic and the development of the Middle East market, Shinestar Holding Group has set up an office in Dubai JUMEIRAH mart at present, and start a journey to visit the customer in United Arab Emirates. It was highly effective for the visit, and has paved the way for understanding and layout the market in the Middle East.   The United Arab Emirates customers are mainly concentrated in two emirates, Dubai and Abu Dhabi.As we know, Dubai is a financial and trade center in the Middle East, brought together hundreds of pipeline equipment and other steel products company;As the capital of the United Arab Emirates, Abu Dhabi is also a large number of oil companies.   There is some large pipeline a

Construction safety management: scaffolding, matters needing attention

图片
Construction safety management: scaffolding , matters needing attention 1, in strict accordance with the set-up, the structure size of the vertical deviation control good poling and rail horizontal deviation, and to ensure that node joins up to par. 2, foot hand piece to pave and spread and spread, may not have the probe plate. 3, according to the specification requirements set rod sweeps the floor, sweep the floor lever to lock. 4, note that the sequence of lap bar. 5, timely with Rachel or use the temporary supporting structure, to ensure the safety of the erection process. 6, fasteners with bar hooking ability within 45 to 55 n/M. 7, the deformation of bar and unqualified clasp (have crack, the size is unqualified, hooking is not tight, etc.) cannot be used. 8, built for the workers must wear a seat belt. 9, vertical and horizontal deviation correction bar at any time, to avoid too much deviation. 10, unfinished scaffolding, completion of the day, it is important to ensure

Construction Safety Management: frame scaffolding erection sequence

图片
Construction Safety Management: frame scaffolding erection sequence External scaffolding Foundation Treatment (Fang skids under or template) → → pendulum sweep shot by the root and establish a pole and sweep shot fastening → install the first row with a small bar and fasten pole → Install Step ledger each pole railing fastening → plus provided a small bar steel → security → install step step step ledger → install → install a small bar step Four large bar and small bar → installation wALL take pole rod → → → plus set scissors erection inspection prior to acceptance or use of more than 10m. Initial start erection when setting bracing reinforcement.

Construction safety management: the erection of scaffolding

图片
Construction safety management: the erection of scaffolding (1) on the laying of the operational layer scaffold board must establish skirting board, skirting board which USES wood and paint besmear brushs eye-catching red and white interval safety, height is not less than 180 mm. (2) the outer scaffold erection process, must strictly in accordance with the provisions, the structure of the scheme and size for the erection, and Rachel and structure in time, ensure the safety of the erection process. (3) the erection shall, from time to time, in the process of vertical and horizontal deviation correction link, avoid excessive deviation. (4) small bar, authors should be perpendicular to the ledger, small on both ends of the bar should be stretched out big bar above 10 cm. (5) connected to the main rail fastener docking, opening should be toward the shelf inside, bolt up, cross fasteners shall not make opening downwards, bolts should be moderately tight. (6) bracing continuously from

WORLD SCAFFOLDING PRICE LIST ( FOB BASIS) CURRENCY USD2016.06.13

图片
Note :The price is only for reference.There will be a little change because of quantity and oeder tir.Any inquiry pls send to our e-mail: scaffolding@hunanworld .com  A large quantity of favorably.We will offer the best price and delivery to you.Thanks.

Construction safety management: scaffolding demolition of safety technical measures

图片
Construction safety management: scaffolding demolition of safety technical measures 1. Open frame before, comprehensive inspection plans to dismantle scaffold, according to the results of the inspection to formulate a work plan, submitted to the approval, after technical clarificaiton work. Work plan generally includes: down the steps and methods, safety measures, materials piled up in the place, labor organization arrangement. 2. The frame should be divided into areas, around a rope tied erected a fence or warning signs, the ground should be designated persons command, prohibit the operation personnel to enter. 3. Open the heights of the aircraft operating personnel should wear safety helmet, wear your seat belt, chaps, wear soft bottom antiskid shoes. 4. Open frame program shall comply with the "top-down, after a first" principle, namely the first safety net, railings, scaffolding, bracing, even the wall bar, and then open the ledger, small bar, post, etc., and accordi

Construction safety management: the scaffold project construction safety technology

图片
Construction safety management: the scaffold project construction safety technology L. scaffold erection or dismantling personnel must be conform to the labor department issued the special operations personnel safety technical training evaluation management regulations upon passing the examination, obtain the operation certificate of special operation personnel's professional scaffolder. 2. Should hold relevant certificates. Operation must wear safety helmet, safety belt, wear non-slip shoes. 3. The fog and rain and snow weather and 6 magnitude when strong winds, the heights of the scaffolding operations is not allowed. Homework after rain, snow, anti-skid safety measures must be taken. 4. Scaffolding , homework, line by line according to the requirement of the formation of basic structure unit, step, and gradually build, rectangle around the scaffold should start from an Angle of extension build-up in both directions. To ensure stable has take part. Gantry scaffolding and othe

Construction safety management: fastener type steel pipe scaffold erection of safety technical requirements

图片
Construction safety management: fastener type steel pipe scaffold erection of safety technical requirements According to the use of the experience at home and abroad and economic rationality, single pipe column the fastener scaffold erection height should not be more than 50 m. More than 50 m high has the following two common practice: 1) the lower part of the scaffold with double tube pillar, upper with single pipe column, single pipe section height under 35 m. 2) halved the scaffold from the bottom of the column, column from the standing on the height of the larger under 35 m.

Construction safety management: frame scaffolding procedures

图片
Construction safety management: frame scaffolding procedures 1) scaffold erection, shall end extends to the other end, step by step from bottom to top mounted, and can change the direction of the erection, step by step to reduce error accumulation. Since the ends to thrust build-up or alternate with, in order to avoid dislocation junction, difficult to connect. 2) the order of the scaffolding. Laid mat technique (plate) - Ann people base - stand up since the end door frame and then cross support to pipe installation level frame (or scaffold board) to install the steel ladder, horizontal reinforcing bar - > installation rod according to the above steps, the wall installed resulto - in accordance with the provisions, location bridging step to assemble the top rail. 3) scaffold erection must cooperate with construction progress, an erection height should not exceed the top three or even the wall free height is less than 6 m, to ensure that the scaffold is stable.

Housing construction project: steel pipe scaffolding dismantling requirements

图片
Housing construction project: steel pipe scaffolding dismantling requirements Scaffold dismantling operations should be removed from top to bottom layer by layer, not allowed to be removed at the same time two layers. Each layer is first removed and the structure of the rod, and then removed the frame body. After the end of the first layer of the construction of the next layer. Each layer should be removed before the first layer of the material on the shelf, garbage and other items cleared clean, and the closure of the outer frame with a safety net removal. The removal process to remove the small bar, a large bar, and then remove the pole and scissors. Should loosen the connection rod parts timely demolition away dismantling process, avoid error and error by rotary loose connection rod. Remove the rod parts, shorter than 3 meters into the first floor, 3 meters longer than the manual transmission to the ground, no throw down. In the process of dismantling, should be well coordinat

Part of the housing construction project: scaffold architecture and basic requirements

图片
Part of the housing construction project: scaffold architecture and basic requirements Different scaffolding series has its own structure characteristics, performance and application limitations. Different construction projects on the installation of scaffolding requirements have their commonalities and differences. Therefore, in solving the problem of construction scaffolding set, must meet the needs of the construction and ensure the requirement of safety, comprehensive consideration of various conditions and factors, solving various problems. Scaffold frame by frame structure, the overall stability and resistance to lateral force member, even the wall and unloading equipment, facilities and other security protection facilities operation layer such as five parts http://www.hunanworld.com/product/

Housing construction project: scaffold erection and assembly after the completion of the acceptance requirements

图片
Housing construction project: scaffold erection and assembly after the completion of the acceptance requirements After the scaffold erection and assembly, should be confirmed by the inspection and acceptance of qualified rear can work. Should step by step, one by one within the period of water head foreman and supervisors and shelf full-time safety technical people and organization acceptance, and fill in the acceptance certificate. According to the following requirements: 1, the fundamental processing of scaffolding, practice and embedment depth must be accurate and reliable. 2, the layout of the shelf, stud, size bar spacing should comply with the requirements. 3, shelves, authors and assembly, including the selection of tool holder and key should comply with the requirements. 4, and even the wall) or with fixed part structure is safe and reliable. Bracing, brace should comply with the requirements. 5, scaffolding safety protection, safety insurance device to be effective. Fast

price list 2016.06.06

图片
Note:The price is only for reference.There will be a little change because of quantity and oeder tir.Any inquiry pls send to our e-mail:scaffolding@hunanworld.com A large quantity of favorably.We will offer the best price and delivery to you.Thanks. http://www.hunanworld.com/

WORLD of the world's most powerful scaffolding manufacturing company

图片
WORLD of the world's most powerful scaffolding manufacturing company, has more than 40 national patents. Existing products cover plate ringlock scaffolding system, support system, and fast steel plank, hot dip galvanized steel, plank couplers, steel pipe, frame system,cuplock and star systems, new aluminum formwork system, aluminum alloy steel (h-beam), etc., are widely used in building facades, building support, bridge, tunnel, chimney, power plants, petrochemical and other kinds of construction engineering project, to provide customers with perfect template scaffold solution. http://www.hunanworld.com/

Ringlock scaffolding template support system have advantages?

图片
Ringlock scaffolding template support system have advantages? China in the field of construction, mainly used for frame scaffolding and ringlock scaffolding, because such scaffolding, simple and quick, the cost is low. And WORLD billiton plate ringlock (scaffold) are template support system in combination with offer ringlock (scaffold) template production and sales experience, according to market demand and development of heavy-duty bearing structure, worksite is 60 mm high strength galvanized pipe, has a high bearing capacity. WORLD billiton set ringlock(scaffold) template support system mainly by the distribution of main beam, secondary beam, and the template, can be used as a ENKOFLEX, Taiwan mould VR, BTM template or ENKOFORMH - 120 template support system. The system is compatible with ringlock scaffolding system can be used, is widely used in roads, Bridges, tunnels, the committee and other projects within the high support and support. Ringlock (scaffold) template support syste

Housing construction project: scaffolding requirements

图片
Housing construction project: scaffolding requirements 1, the support bar type cantilever scaffold erection requirements Support bar type cantilever scaffolding, need to use load control, set-up is strong. Set-up should build good shelf, when make the bar out of the wall, then diagonal brace up and pick out the rail connection is firm, then build cantilever part, scaffolding, peripheral to rail and feet, for the net, in order to protect security. 2, even the wall piece set According to the axis of the building size, in a horizontal direction every 3 (6 m) set a. Every 3 ~ 4 meters in the vertical direction should be set up, all point and ask each other the stagger, forming the plum flower arrangement, even the wall of the serpent method is the same as the console scaffold. 3, vertical control Set-up, we will strictly control section of the scaffold of vertical degree, vertical degree of allowable deviation. 4, scaffolding laying Scaffolding should be put with thick wooden plank